Subscribe to us:
Follow us on Twitter! Like us on Facebook! Connect on LinkedIn!

Search articles

Got a news story?

Call 0845 034 6690, email news@innovatemyschool.com, or read how to feature an article.

Educational Partners

   

Colchester Council opts for 3 new ‘Early Learning’ buildings with high quality, timber-framed modular solutions

By Premier Interlink (Waco UK Ltd) on 11 August 2011, 10:07am | Case Studies

Colchester Council recently chose Premier Interlinks exciting new PremierClassic building for the construction of 2 pre-school centres and a primary school building.

This cost-effective off-site construction system from Premier Interlink (Waco UK Ltd), uses only timber sourced from FSC registered companies. It not only met their needs for sustainability, warranties and quality, but also offered surety of cost and programme.

The system is ideal for one or two storey buildings and has a superior acoustic performance, high levels of thermal insulation to dramatically reduce the building's carbon footprint and meets all relevant building regulations.

From placement of order to handover, the project was completed within a 12 week period.

Each building incorporates an overhanging roof, large picture windows, exterior cedar cladding and rendered panels and building entrances that comply with DDA & part M requirements. Internally there are spacious classrooms, a baby room, offices, training room, lobby, toilets and disabled toilets.

Read 763 times
Premier Interlink (Waco UK Ltd)

Premier Interlink (Waco UK Ltd)

Phone: 0800 316 088

Website: www.waco.co.uk Email: This e-mail address is being protected from spambots. You need JavaScript enabled to view it

Stay up to date!

Ads by Google

Leave a comment

Share your thoughts on this article with our readers.



Give Feedback!